Gilgandra High School

CLIENT
DATE
SERVICES
Gilgandra High School

Project Delivery time:

  • Preconstruction 4 weeks
  • Onsite construction 4 weeks

Terraworx Pty Ltd were one of 3 companies selected to tender on the integration and security upgrades to Gilgandra High school, and were successful.

This project included the supply of cameras, access control and intercom systems, along with nearly 750m of fencing. Terraworx Pty Ltd used one of our Xtreeme cantilever gates as well as one of our Xtreeme Access control gates including integrated cameras and intercoms to give the school control over who comes and goes into and out of the school. These gates were all pre-fabricated and powder coated in our Armidale factory and with great packing and freight arrived in A1 condition.

The pre-fab system means reduced time on site and is great for installation in rural and remote locations where travel and accommodation costs are a challenge. All can be installed with a small 2-ton excavator. Even our large gates are designed to be modular so that the sections are all assembled on site and can be lifted with a smaller machine. Both items have worked flawlessly for nearly 1 year. The result is the school now has a secure learning environment for the students.

get a quote

Please tick all that apply to you